Previous Topic: Verify the Backup was SuccessfulNext Topic: Review the Prerequisites for Modifying a Backup Job


How to Modify and Rerun a Backup Job

If you have already created a job for a node, you can modify it and rerun the job multiple times. You do not have to create another job to protect the same node. If you do not want to make any changes to the job, you can also run the job without modifying it. Modifying a job includes adding a node to an existing job, configuring the job settings, or both.

The following diagram displays the process to modify and rerun a backup job:

How to Modify and Rerun a Backup Job

Perform these tasks to modify and rerun a backup job: